Two Gottwald Mobile Harbour Cranes will handle 50,000 t of container freight per year at St. Peter Port Harbour in Guernsey, UK.
“When fully operational, the two Terex Gottwald Mobile Harbour Cranes will be doing the work of the four former cranes”
– Harbour Master, Captain Peter Gill
Terex Port Solutions has delivered and commissioned a Terex® Gottwald HMK 170 E Mobile Harbour Crane to St. Peter Port Harbour in Guernsey, UK. This represents the first phase of the project, with another HMK 170 E crane scheduled for delivery during November 2013.
The Cranes will handle 50,000 tons of container freight per year
With 98% of Guernsey’s imports and exports passing through St. Peter Port, the harbour is currently undergoing a 13.75 million pound refurbishment of its freight handling facilities. The modernisation includes the replacement of four existing cranes with two Terex Gottwald cranes, which will handle 50,000 t of container freight per year.
The 63 tons configuration Terex Gottwald HMK 170 E Mobile Harbour Cranes have a radius of 38 m and feature self-powered diesel generators. For increased efficiency and to avoid exhaust emissions within the port, the cranes are hooked up to electrical shore supply power connections.

Related Stories
Hoeflon sets out four-step plan for lifting on cramped jobsites
Dutch mini crane builder Hoeflon has published practical guidance for contractors who must place steel, glass or machinery…
Jekko SPX1280 named best mini crane at PEM Awards 2026
Jekko's SPX1280 has won the Best Product of the Year title in the mini crane category at the…
Tadano names Mang Chong as mobile crane distributor for Taiwan
Tadano has appointed Taoyuan-based Mang Chong Enterprise, a partner since the 1980s, as its official distributor for mobile…