In Bavaria, Germany, the A7 Autobahn spans the Sinntal for well over 750 m. The solid-web girder bridge, erected in 1967 was replaced with new construction in 2013. Plannerer GmbH & Co Kg was commissioned to demolish the old Sinntal bridge. Two Sennebogen 683 R-HD telescopic crawler cranes help to remove parts of the welded truss and plate construction that weigh many tons.

Related Stories
Tadano PM 18 SP loader crane rides a PistenBully at Kronplatz
Ski resort operator Funivie di Valdaora services its tower-mounted snow cannons with a Tadano PM 18 SP knuckle…
Ponticelli MK 88-4.1 repairs JR’s Pont-Neuf artwork in Paris
A Liebherr MK 88-4.1 mobile construction crane from Ponticelli repaired storm damage to artist JR's inflatable installation 'La…
Potain tower cranes build Indonesia’s new presidential palaces
A Potain MC 310 K12 and MC 205 B are erecting the Garuda Palace and State Palace in…