One of GGR’s mini spider cranes, a 6 tonne capacity UNIC URW-706, was used with an MRTA611 Six-in-Line glass vacuum lifter to help glaze the external walls of the venue now that the temporary seating area used for the London 2012 Olympic Games has been removed.
The spider crane and glass sucker were able to lift the first of the 1.5m x 3m glazed panels from a ground level stillage and install them at a 16 meter height. An impressive 628 pieces of 250kg screen printed glass are to be fitted which will cover 2800m² on the east and west sides of the Aquatics Center and let plenty of natural light into the swimming pool area.
[nggallery id=4]
Related Stories
Link-Belt TCC-2500 on billion-dollar Puerto Rico flood project
A Link-Belt TCC-2500 telecrawler is tandem-lifting 50,000 lb rebar cages and installing sheet piling on the Rio Puerto…
Zoomlion ZCC6000 crawler crane tackles Indonesian power plant lifts
A 500-tonne Zoomlion ZCC6000 crawler crane with super-lift tower-boom rig is placing 60-tonne boiler drums at an alumina…
Seven Liebherr tower cranes on Ulm’s B10 bridge replacement
ARGE B10 is replacing Ulm's Wallstrassenbruecke with a seven-crane Liebherr concept from Nagel Mietservice, led by two 520…