Ehingen / Donau (Germany) August 2018 – Teamwork in our home town – in June two Liebherr mobile cranes replaced a 20 year old debarking drum at the Sappi paper factory in Ehingen. This is also the location of the Liebherr manufacturing plant for mobile and crawler cranes. An LTM 1350-6.1 from Rieger & Moser and an LTM 1400-7.1 from Fricke-Schmidbauer worked together to carefully hoist the 90 tonnes load.
The roof of the factory building had been removed to replace the drums. The two cranes showed their sensitive side both when removing and inserting the heavy load. Firstly, the cranes had to lift the load evenly, and secondly, the long drum had to be guided through the gap between the two cranes.
The new debarking drum is 32 metres in length with a diameter of 5 metres. Made up of a number of half-shells, it had been welded together over a period of several weeks on the Sappi factory site. Whole trunks of beech and spruce are rubbed against each other in the giant drum, causing the bark to fall off.
Rieger & Moser and Fricke-Schmidbauer are part of the Schmidbauer Group with a workforce of around 600. The whole group now has more than 20 outlets throughout Germany and runs 200 mobile cranes and 150 heavy haulage transporters.

Related Stories
Italy’s first Liebherr Fibre crane builds Val Trompia water plant
Facchetti Costruzioni has put a Liebherr 240 EC-B Fibre to work on the Bovegno drinking water treatment plant…
Pontáns Kranar MK 88-4.1E shifts canopy roof to roof in Uppsala
Squeezed between two six-storey blocks in Uppsala, a Liebherr MK 88-4.1E lifted nearly 20 aluminium canopy segments of…
Pair of Unic URW-706 spider cranes float in to renew canal lock gates
With no road access to the lock, two Unic URW-706 mini spider cranes travelled to site by pontoon…