In the course of the expansion of the exhibition building, new conference rooms will be constructed above the existing hall 7. The future glass roof will be supported by a steel construction. While other cranes were either too large or too heavy in order to work on top of the hall roof, the choice fell on the 613 telescopic crane crawler. The equipment was provided by our French sales and service partner Sygmat. Having a lifting capacity of 16 t and a cab that can be easily raised, plus the option to move components under full load, the SENNEBOGEN 613 was the product of choice.

Related Stories
Tadano PM 18 SP loader crane rides a PistenBully at Kronplatz
Ski resort operator Funivie di Valdaora services its tower-mounted snow cannons with a Tadano PM 18 SP knuckle…
Ponticelli MK 88-4.1 repairs JR’s Pont-Neuf artwork in Paris
A Liebherr MK 88-4.1 mobile construction crane from Ponticelli repaired storm damage to artist JR's inflatable installation 'La…
Potain tower cranes build Indonesia’s new presidential palaces
A Potain MC 310 K12 and MC 205 B are erecting the Garuda Palace and State Palace in…