A new SENNEBOGEN 655 HD duty cycle crawler crane has recently been deployed by the Aschaffenburg Water and Shipping Authority. Positioned on a multi-purpose ferry, the machine lifts steel plates, several tons in weight, for maintenance of the Offenbach lock Chambers.
The Aschaffenburg Water and Shipping Authority (WSA) as a federal authority is responsible for the maintenance of the Main federal waterway, from the mouth in the Rhine upstream to river kilometer 185.2. The 15 lock operating points, in particular, require regular maintenance and inspection. For this purpose, the WSA has extensive machinery, which, since July 2014 has been supplemented with a new SENNEBOGEN 655 HD duty cycle crawler crane. The machine with an extensive range of special equipment was especially designed for use on the so-called multi-purpose ferry “Muräne” by the specialist department Mechanical Engineering – South.
For more information, see the press release.

Related Stories
Tadano PM 18 SP loader crane rides a PistenBully at Kronplatz
Ski resort operator Funivie di Valdaora services its tower-mounted snow cannons with a Tadano PM 18 SP knuckle…
Ponticelli MK 88-4.1 repairs JR’s Pont-Neuf artwork in Paris
A Liebherr MK 88-4.1 mobile construction crane from Ponticelli repaired storm damage to artist JR's inflatable installation 'La…
Potain tower cranes build Indonesia’s new presidential palaces
A Potain MC 310 K12 and MC 205 B are erecting the Garuda Palace and State Palace in…