Energias de Portugal, the largest electric utility company in the Portugal, has been building the Baixo Sabor hydroelectric plant in the municipality of Torre de Moncorvo. Comprised by two dams, the main one is located upstream of the Sabor River and set 9.5 kilometers apart from the downstream one, that will flood an area over 50 km.
The jobsite employs up to 1675 people, with an excavation volume of around 3,000,000 m3, where a volume of 1,100,000 m3 concrete shall be used. The magnitude of the project also requires a large amount of machinery. Therefore, Ibergru has supplied 15 Linden Comansa cranes to the jobsite. The flat-top tower cranes have a maximum load in a range between 5 and 48 tons.
[nggallery id=2]

Related Stories
Tadano PM 18 SP loader crane rides a PistenBully at Kronplatz
Ski resort operator Funivie di Valdaora services its tower-mounted snow cannons with a Tadano PM 18 SP knuckle…
Ponticelli MK 88-4.1 repairs JR’s Pont-Neuf artwork in Paris
A Liebherr MK 88-4.1 mobile construction crane from Ponticelli repaired storm damage to artist JR's inflatable installation 'La…
Potain tower cranes build Indonesia’s new presidential palaces
A Potain MC 310 K12 and MC 205 B are erecting the Garuda Palace and State Palace in…